Journey Along the Upper Level Track


The upper level of track is approximately 100 feet long with one passing siding located near the shay line. This branch line weaves its way through backdrops as it makes its way around a large figure-8 trackplan. The branch line is accessed via a connector track at the Henry Clay Iron Furnace and Chickies Rock. The return connector track begins in the city, travels through the canyon and down to Columbia Yard where it merges with the mainlines.

The branchline makes its way along an embankment above Brandtsburg, the Canyon, the big city, and Bekinstown. It crosses a long steel trestle above the large city industrial area. It also enhances operation and creates longer runs between towns, yards and local industries.



On the Embankment Behind Brandtsburg


Crossing The Steel Trestle


Rounding The Bend


Pennsy Shark Behind Brandtsburg


Freight on the Branch


Buildings Along The Branchline


View From A Distance


Another View On The Embankment Above Brandtsburg


Trees Added Above Bekinstown


Brandtsburg

Columbia

Canyon

Shay Line/ Mellinger Lumber Co.

Chickies Rock/ Iron Furnace

Big City

Layout Access Areas

Bekinstown

Hinkly